内页banner
Current: Home > News > Industry dynamics

ContactContact Us

Qingdao Zhongbo Steel Structure Co., Ltd

Contact phone: 13210005888

Fax: 0532-87900666

Contact email: zhongboganggou@126.com

Website address: www.zhongboss.com

Contact address: Jimo District Lancun Sub-district Office Nanquan Dai Jiazhuang No. 162-12 Zhongbo ecological Park

Steel structure plant installation and maintenance work

2022-03-23 15:18:20
times

The literal meaning of the steel structure plant can also be understood, which is also an industrial plant built with steel and other load prefabricated components. Although the overall weight is light, the compressive strength is high and the cost is low. If you want to know how to ensure the service life of the steel structure plant, you can do daily maintenance work.

 

After the installation of the steel structure plant, for the owner, can not change its structure without authorization, can not disassemble the screws and other components, can not lift the partition wall, if you need to change what position, must be discussed with the manufacturer, by the manufacturer to distinguish whether it can be changed. The steel structure must be maintained with paint within 3 years after application, and then give the engineering building a beautiful and generous safety factor. The steel structure plant is connected by metal structural components, so when running electrical equipment, such as cables are protected by kbg tubes to prevent safety accidents.

 

Steel structure plant must be cleaned and maintained on time, and under normal circumstances, check and maintain once a year. When cleaning the exterior wall of the steel structure plant, be careful not to have a messy situation, do not use steel balls, row brushes and other ground detergent products, and clean from top to bottom when using water. Steel structure plant should remove tree technology, fallen leaves and other similar products in time to prevent the inventory backlog caused by many unnecessary inconvenience. If there is damage to the metal plate surface of the steel structure plant, it should be repaired in time to prevent the metal surface from being eroded by the sun and rain. If it is necessary to choose all high-elastic nano-composite materials to maintain the metal roof, and play a reasonable thermal insulation and anti-corrosion effect, save indoor air conditioning energy.

  • Office location

    No. 178 Shuangyuan Road, Chengyang District, Qingdao

  • Jimo factory address

    Jimo District Lancun Street office Nanquan Daijiazhuang No. 162-12 Zhongbo ecological Park

  • Lacey factory address

    Laixi City 204 national highway around the ridge No. 2 Changjia Road, Industrial Park

24-Hour Hour Hotline

13210005888

Copyright © Qingdao Zhongbo Steel Structure Co., Ltd All rights reserved record number:鲁ICP备17049115号 Mainly engaged inQingdao steel structure, Qingdao steel structure manufacturer, laser cutting processing, Welcome to inquire! Technical Support: 浩瀚网络